The Importance of Stakeholder Relationships for the Mining Industry
Stakeholder engagement is often discussed as part of a mining company’s social license to operate but their influence reaches much further, into the successful development of a mine.
If we measure the success of a mine through its lifecycle, from discovering a fruitful deposit to bringing that deposit into production, this process needs to consider resource size, ore grade, recovery rates, capital expenditure, operating costs and projected production, in order to measure potential success. However, many of the decisions involved in designing, financing and operating a mine depend on the relationships that mining professionals have with regulators, local communities, suppliers, employees, governments and others.
Good or bad relationships with stakeholders can affect permitting schedules, procurement strategies, construction timelines, infrastructure and water availability, ultimately highly influencing a mine’s success.
Water
Water is a crucial part of mine planning, especially in arid environments. Consider processing circuits, dust suppression, equipment maintenance and many other activities including taking care of employees, require reliable water access and security. Availability is the first step but quality, seasonal variability, groundwater recharge are all important dynamics to consider.
For Emiral, this is particularly important in our project in Mauritania, a country where water resources are often unevenly distributed, especially in remote, desert regions. For this reason, Emiral started its water programme together with gold exploration. The geophysical surveys and hydrological drilling Emiral undertook since 2021, confirmed groundwater availability in the project area, an important milestone for the development of our proposed processing plant, however the wider dynamics are more complicated.
Despite its extensive coastline, only 6 in 10 people have access to a steady supply of drinking water in rural areas of Mauritania and the only major groundwater source is the Senegal river, with groundwater accounting for only 3% of the country’s renewable water resources. In the remote north, where the Iguidi project is located, there is no surface water. Groundwater is held in deep fractured rock, with limited recharge and high salinity.
Consequently, developers cannot treat water as a conventional utility. Water availability is increasingly, the main bottleneck restricting future mineral production, particularly for water-intensive metals like gold. Securing regional water availability, having rigorous baseline monitoring as well as a clear, water-sharing framework with regional stakeholders, are essential to maintain a sustainable social license to operate.
Tailings
The design of a tailored, tailings storage facility (“TSF”) requires extreme consideration of geology, site topography, construction materials, deposit methods and overall, long-term stability. Beyond these technical considerations, local communities, land users and regulators, should all be involved in how risks of building a TSF are assessed and managed.
The Global Industry Standard on Tailings Management (“GISTM”) makes this connection explicit, in its principles and requirements and even in its own creation. The GISTM was developed by the United Nations Environment Programme and the International Council on Mining and Metals, following the 2019 Brumadinho tailings dam disaster in Brazil. The standard was created to achieve zero harm to people and the environment across the entire lifecycle of a tailings facility.
Principle 3 of the GISTM in particular, requires mining operators to use all elements available to them from local and regional knowledge. This includes economic and technical, but also environmental and social, to inform the decisions required to be made to create a successful TSF. This standard marked a significant development in mining practice by recognising that technical design cannot be separated from the environment in which these facilities operate.
At Iguidi, Emiral applies these principles from the design stage. The project will use filtered, dry-stacked tailings instead of a conventional slurry dam. This approach removes the need for a water-retaining embankment, reduces the risk of failure and returns most process water to the plant, which is critical in a desert environment.
Permitting and licenses
Engagement with regulators is sometimes viewed as a process that simply follows the completion of technical and engineering studies. However, these licenses and permitting requirements, should be considered simultaneously with early project design.
This is particularly relevant under Mauritania’s mining code, which requires consideration of a project’s environmental impacts and technical choices. For gold projects, especially those like Emiral that use carbon-in-leach processing, environmental assessments can directly influence how a gold mine and its processing facilities are designed. These include cyanide storage and handling, residual cyanide management in tailings, the recycling of process water and the characterisation of waste rock, to assess acid-generation potential.
Environmental and Social Impact Assessments require baseline information, many times information that can only be obtained via local and regional stakeholders. In August this year, Emiral submitted the Terms of Reference for this assessment, triggering the statutory mining licensing procedure, which illustrates the importance of coordinating engineering with regulatory workstreams.
There is also a commercial dimension. Research shows that for pre-production mining projects, permitting issues (45%), stakeholder opposition (26%) and environmental concerns (24%), are the main contributors to project delays. The same research also shows that for a mining project, with a capital expenditure of US$3-5 billion, could lose approximately US$20 million in value, for every week of delay. While these figures are not specific to gold developments, they demonstrate the potential financial consequences, when issues are treated as separate from the main project planning.
Local Communities
Engagement with communities must start well before construction. Understanding existing land use, livelihoods, how these are related to the natural resources and many other considerations, can influence the location of infrastructure, as well as manage potential impacts.
For communities, engagement must begin well before construction. Understanding existing land use, livelihoods, transport routes and access to natural resources can influence the location of mine infrastructure and the management of potential impacts. The International Finance Corporation Land Acquisition and Involuntary Resettlement Handbook showcases the importance of baseline studies, stakeholder consultation and livelihood restoration in project planning.
One case study from the handbook, analyses a West African gold project, where initial environmental assessments had been conducted during the dry season. This concluded that no water was found near the project, with the nearest permanent river being more than 70 km away. However, when the same assessments were conducted during the wet season, they revealed that seasonal tributaries supported fish populations harvested by local communities as a significant food source. Since this had not been identified in the first round of environmental assessments, it could have led to gaps and caused impacts that mine developers need to address. This demonstrates why local knowledge, including seasonal patterns of land and resource use, must inform environmental baselines and project design from the outset.
From a workforce development perspective, community relationships are also a crucial element. Mining operations require incredibly specialised capabilities across geology, metallurgy, maintenance, process control and environmental management. It relies on the seamless integration of distinct technical disciplines to operate safely, profitably and sustainably.
Building local expertise, through technical training, knowledge transfer and local institutional capacity-building, can transition short-term jobs to long-term operational employment. Ultimately, effective community and supplier relationships generate both economic and social benefits but also support local and regional communities in establishing those workforce capabilities, supply chain reliability and understanding the local conditions, which are required to support a mine throughout its operating life.
Making relationships part of the development strategy
The metals and mining industry has increasingly recognised that technical and commercial success and stakeholder engagement cannot be pursued separately. For Emiral, our development of the Iguidi project illustrates the various dynamics that need to come together to advance a mining project. What began in 2020 with early prospecting, has grown into an exploration campaign and into what is today as Mauritania’s largest gold exploration project, with more than $85 million invested. With our Front-End Engineering and Design to be completed by the end of this year, our update on the advancements being made to the project, provides further context on the project’s technical work as well as our environmental and social assessment.
We have a serious opportunity, to treat the technical steps needed to bring the project to production, alongside the relationships with our stakeholders. Regular dialogue with communities, regulators and suppliers, can inform environmental baselines, design and approval requirements, shape procurement strategies and overall strengthen operational readiness.
The quality of a project’s engineering determines what the physical and technical aspects are, but the relationships behind that project determine whether it will be successfully sustainable.